Daily Production Report

Production Paperwork

INSTRUCTIONS

The Second Assistant Director is responsible for sending out a PDF of the Daily Production Report (DPR) at the end of every shooting day, no later than two hours after wrap. If the production does not have a dedicated Second Assistant Director, the First Assistant Director or Producer shall assume the responsibility.

The purpose of the DPR is to communicate important information from the day’s production, such as number of setups, start and end times, in and out times, reports on delays, and reports on equipment problems. If an urgent problem or situation arises on set, however, do not wait until the end of day to report it; contact the appropriate individuals immediately. (Make sure it is documented on the DPR at the end of the day as well, though.)

Post the completed DPR the “DPRs” channel on Teams. The PDF file should be formatted with production number and show title as follows: 

01f3-DPR-Day1.pdf

DPR Sample