Project Meeting
The Director(s) of each project will have a required Zoom meeting with Valerie some time during the project’s production window. Each team should schedule those meeting times with Valerie and add them to your Production Schedule in Google sheets.
Daily Reporting
Each group must post a report in the group’s Teams channel by midnight (EST) every day during F2 Production. Missing, late, or incomplete reports will result in a grade reduction for all members of the group. Directors should post on their shoot days, and anyone can post on non-shoot days.
Each day’s report should include the following information:
1. What did you accomplish today?
- A short summary of the day’s events
2. Photo of the day
- If it was a shoot day, then include a behind-the-scenes photo.
- If it was not a shoot day, then any photo that is indicative of the day’s events.
3. Any additional concerns
- Any incidents, accidents, delays, equipment problems, health concerns, etc.