Pre-Production

  • Assist the Producer with any and all logistical needs to prepare for principal photography.
  • Coordinate with department heads to update the Daily Prep Schedule. Then distribute to the crew by 6pm each day of pre-pro.
  • Prepare Crew Deal Memos for everyone at the production meeting.
  • Assist Producer in securing lunches, craft services, volunteers, and extras for all days of shooting.
  • Assist Producer in obtaining craft services the night before production.
  • Assist the Producer in casting by scheduling and participating in auditions if necessary.
  • Prepare and make copies of all the paperwork needed on set. Give to 2nd AD to distribute and collect.
  • Oversee the 2nd AD in the creation of the Call Sheet. Once the Production Manager and the 1st AD approve the Call Sheet, map and set diagram, have 2nd AD distribute copies.
  • Communicate any changes to the schedule to the 2nd AD to disseminate to the cast and crew.
  • Check the weather periodically to monitor adverse conditions. Have a back-up plan.
  • Double check every logistical piece of information and make sure nothing has been forgotten.

Production days

Start of day

  • Arrive at set FIRST, at least 30 minutes before call time.
  • Open and establish contact with location. Record the state and location of things, ground rules.
  • Deliver the craft services to the 2nd AD and assist them in setting up the craft service table.
  • Give the 2nd AD all the paperwork you prepared ahead of time for them to have completed throughout the day.
  • When trucks arrive, verify they are parking in the correct place.

Throughout the day

  • Make sure everything is going as planned throughout the day, and troubleshoot logistics as needed.

Meals

  • Double check with the caterer or restaurant that lunch will be ready on time.
  • Pick up lunch and bring it back to set with enough time for the 2nd AD to set it up prior to releasing for lunch.
  • During lunch, review the next day’s Call Sheet with the 2nd AD.

End of day

  • Collect all the Daily Production Paperwork and media cards from the 2nd AD. Double check for accuracy & completion.
  • With 2nd AD, clean and secure location. Be the LAST TO LEAVE (except perhaps Art Dept). Leave the location better than when you arrived.
  • Approve the Daily Production Report and have 2nd AD distribute copies within 2 hours after company wrap.

Post-Production

  • Organize and scan all the of the Daily Production Paperwork for the Producer and deliver in both hard copy and electronic form.